Alternatives

Projul alternatives for small contractors

Projul is a sales, scheduling, and payments tool for residential contractors with a clear published price list. The catch is where features sit: job costing, progress billing, and QuickBooks Online start at Core+.

A project engineer in a hardhat and safety vest uses a rugged tablet beside steel wall framing.
Capture field information where the work happens, then route it to the people who need it. AI-generated illustration.

The main Projul alternatives are JobTread, which puts every feature, job costing included, on one per-user plan, Contractor Foreman for cost-focused GCs and trades, Houzz Pro for design-build remodelers who also want marketing tools, Knowify for commercial subs, and Jobber or Housecall Pro for service-call trades. Projul is still a good pick for remodelers and roofers who want strong lead management and hands-on support. Prices below were taken from each vendor's own pricing page in October 2026.

Who Projul fits

Projul's tiers stack features on top of each other, and the tier map matters more than the base price. Here is what its pricing page showed in October 2026.

Projul plans, checked October 2026
PlanAnnual billingMonthly billingUsersWhat it adds
Starter$199/mo ($2,388/yr)$249/moUp to 3Lead management, estimating, invoicing, scheduling
Core$399/mo ($4,788/yr)$529/moUp to 10Change orders, CRM and eSignatures, payment processing, full mobile app
Core+$599/mo ($7,188/yr)$799/moUp to 20Job costing and budgeting, progress billing, client portal, QuickBooks Online, unlimited subs
Pro$1,199/mo ($14,388/yr)$1,599/moUnlimitedAI Connect, field takeoffs, daily logs, GPS and geofencing, purchase orders and selections

Annual plans above Starter include a Premium Support Package that Projul values at $4,500. Veterans get 5 percent off. QuickBooks Desktop and Spanish app translation are Pro features. That structure suits a remodeler or roofer whose biggest problem is leads falling through the cracks and crews showing up on the wrong day.

Why contractors look for Projul alternatives

  • Job costing sits at Core+. If you need to compare estimate to actual on every job, the realistic entry price is $599 a month billed annually.
  • Progress billing at Core+. Builders billing on a schedule of values or draws hit the same line.
  • Daily logs at Pro. A company that wants a daily log on every job needs the top tier at $1,199 a month billed annually.
  • User caps. Starter covers up to 3 users. The fourth office login moves you to Core.
  • Commercial work. Subs that bill AIA pay apps to GCs often want billing built around that format.

6 Projul alternatives and who each fits

1. JobTread

Fits builders and remodelers who want every feature without tier gates. $199 a month with one internal user on monthly billing, plus $20 per user for users 2 to 10 ($16 on annual). Job costing, budgets, change orders, daily logs, purchase orders, selections, AIA payment applications, customer portals, and QuickBooks Online integration are all on the one plan. See Projul vs JobTread for the full breakdown.

2. Contractor Foreman

Fits cost-focused GCs and trades that want field tools such as daily logs, time cards, and change orders alongside invoicing. Its pricing page could not be loaded when checked in October 2026, so confirm current plans, user limits, and which tier includes job cost reports directly with Contractor Foreman.

3. Houzz Pro

Fits design-build remodelers and interior-heavy firms. Houzz Pro lists 3D floor plans, takeoffs, mood boards, selections, CRM, scheduling, daily logs, estimates, proposals, job costing, change orders, invoices, QuickBooks integration, plus a custom website, email marketing, and lead generation. Pricing was not visible on its site when checked; request a quote.

4. Knowify

Fits commercial subs and mixed service-and-project trades. AIA G702 and G703 billing on every plan. Core lists $99 or $149 a month by billing term with one user; Advanced lists $329 or $399 with 10 users and adds job costing and WIP. Extra users $29 a month.

5. Jobber

Fits service trades with many small jobs. Core lists $49 a month for one user. Grow, which includes job costing and two-way texting, lists $199 a month for one user before intro and annual discounts. Extra users $29 a month.

6. Buildertrend

A residential builder platform that is also absorbing CoConstruct users. Its pricing page returned an access error when checked, so get a quote in writing. More in Buildertrend alternatives.

Comparison table: price to get job costing

Lowest published monthly price that includes job costing, 5 office users, checked October 2026
ToolPlan neededApproximate monthly cost, 5 usersNotes
ProjulCore+$599 annual or $799 monthlyUp to 20 users
JobTreadSingle plan$199 + 4 x $20 = $279 monthly20% off on annual
Contractor ForemanNot confirmedNot confirmedPricing page could not be loaded; request a quote
KnowifyAdvanced$329 or $399Up to 10 users
JobberGrow, 5 users$299 list monthlyLower intro and annual rates shown
Houzz ProNot shownNot shownRequest quote
BuildertrendNot confirmedNot confirmedRequest quote

How to choose between them

Say you run a roofing company with an owner, two salespeople, an office manager, and a production lead. You want job costing so you can see which roof types actually make money. On Projul that is Core+. On JobTread it is in the one plan, at $279 a month for five users on monthly billing. If your strength is selling and you have no one to watch job cost reports anyway, Projul's sales tools may still be worth the premium. Be honest about which problem is costing you more.

Also ask each vendor three questions before you sign. What does the renewal price look like after any intro rate ends? What happens to your data and files if you cancel? And who handles setup: is onboarding included, or is it a paid package? Projul bundles its support package into annual plans above Starter, while JobTread lists free implementation, training, and support. Those differences are easy to miss when you only compare the headline monthly number.

For more detail on what goes into the bill, see how much construction software costs, and for roofing-specific needs see roofing software.

Where Smart Business Automator fits

Smart Business Automator is a newer, per-user product: Starter $19, Professional $40, Business $67, and Enterprise $100 per user per month. It covers project tracking, invoicing, subcontractor and shipment tracking, change orders, job costing and WIP views, compliance and certified payroll preparation, and AI help with daily log summaries, document data extraction, RFI drafting, and risk alerts. It connects to the accounting and field tools you already run. It is not a lead management CRM, so it suits teams whose pain is job cost and paperwork more than sales. See our pricing or change order approval automation.

Frequently asked questions

How much does Projul cost?

As checked in October 2026, Projul runs from $199 a month billed annually ($249 monthly) for Starter with up to 3 users, to $1,199 a month billed annually ($1,599 monthly) for Pro with unlimited users.

Which Projul plan includes job costing?

Job costing and budgeting start at Core+, which is $599 a month billed annually or $799 monthly for up to 20 users.

Does Projul integrate with QuickBooks?

QuickBooks Online starts at Core+. QuickBooks Desktop is listed as a Pro feature.

What is a cheaper alternative to Projul?

JobTread is $199 a month with one internal user and every feature included, plus $20 per user for users 2 to 10 on monthly billing. Jobber Core lists $49 a month for one user, though job costing starts on its Grow plan. The cheaper choice depends on how many users and which features you need.

Sources

  1. Projul: Pricing (checked October 2026)
  2. JobTread: Pricing (checked October 2026)
  3. JobTread: Features overview
  4. Contractor Foreman: Pricing (could not be loaded, October 2026)
  5. Houzz Pro: Product overview
  6. Knowify: Pricing (checked October 2026)
  7. Jobber: Pricing (checked October 2026)
  8. CoConstruct: Transition to Buildertrend notice
Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment