What is a construction manager?

A construction manager is the person, or firm, responsible for planning and controlling a construction project's budget, schedule, quality, and safety. The term covers both an individual job role and a contracting arrangement where a CM firm manages the job for the owner.

Two construction professionals review paper plans beside a tablet at a jobsite workbench.
Plan reviews connect field conditions, drawings, and the next decisions on a job. AI-generated illustration.

"Construction manager" means two different things, and it helps to know which one someone means. Inside a contracting company, it is a job title for a senior person who runs projects or a group of project managers. In a contract, it means a firm hired by the owner to manage construction, either as an adviser or as the builder under construction management at risk.

The construction manager as a job role

At a $20 million a year general contractor, the construction manager might oversee four to six active jobs. Day to day that means:

  • Reviewing budgets, cost to complete, and monthly projections with each PM.
  • Signing off on change order pricing and subcontract awards over a set amount.
  • Resolving schedule conflicts between jobs over crews and equipment.
  • Meeting owners on problem jobs and big claims.
  • Hiring, training, and reviewing PMs and assistant PMs.

The superintendent runs the field, the PM runs the contract and the paperwork, and the construction manager runs the portfolio of jobs. Titles vary a lot by company, so job descriptions matter more than the name. A construction manager at a 15-person remodeler may also estimate, sell, and run one job personally, while at a large GC the role is closer to an operations executive.

The construction manager as a contracting role

Two ways a CM firm can work for an owner
CM agent (CM adviser)CM at risk
Holds trade contracts?No, the owner doesYes
Carries cost risk?NoYes, above the GMP
How paidProfessional feeFee plus cost of the work
Typical dutiesAdvise, schedule, review pay appsPrecon, then build under GMP

Say a hospital system hires a CM adviser for a $60 million tower. The CM reviews designs, packages bids for 25 prime trade contracts the hospital signs directly, runs the schedule, and reviews each prime's pay application. If a trade defaults, the hospital carries the risk. Under CM at risk, the CM would hold those 25 contracts and the risk. The hospital would get one contract and one party to call, but it would pay for that with a fee and a negotiated GMP instead of 25 hard bids.

Common misunderstandings

  1. Assuming a CM adviser is responsible for trade performance. Unless the contract says so, the trades answer to the owner.
  2. Confusing construction manager with owner's representative. Owner's reps work for the owner too, but usually without the CM's scheduling and coordination duties across trade contracts.
  3. Expecting a construction manager job title to mean the same thing at every company. Some firms use it for what others call a senior PM.

Related terms

See general contractor, construction manager agent, and delivery method. For the people side, read construction project manager responsibilities explained and superintendent vs project manager.

Frequently asked questions

What is the difference between a construction manager and a general contractor?

A general contractor builds under a contract with the owner and holds the subcontracts. A construction manager may do the same (CM at risk) or only advise the owner without holding trade contracts (CM agent).

Is a construction manager the same as a project manager?

Not usually. In many companies the construction manager is a level above project managers and oversees several jobs.

Do construction managers need a license?

It depends on the state and the role. A CM at risk that performs construction typically needs a contractor license. Check the contractor license requirements by state.

Who pays the construction manager?

On owner-side CM contracts, the owner pays a fee. Inside a contracting company, the construction manager is an employee.