Insurance and bonds

What is general liability insurance in construction?

General liability (GL or CGL) insurance covers claims from third parties who are hurt, or whose property is damaged, because of a contractor's operations or finished work.

Two construction professionals review paper plans beside a tablet at a jobsite workbench.
Plan reviews connect field conditions, drawings, and the next decisions on a job. AI-generated illustration.

General liability insurance, usually written as a commercial general liability (CGL) policy, protects a contractor when someone outside the company claims the work caused bodily injury or property damage. It pays defense costs and covered settlements. It is the policy every owner and general contractor asks to see on a certificate of insurance before a crew is allowed on site.

The key word is third party. GL covers the neighbor, the owner, the tenant, the delivery driver. It does not cover your own employees. Their injuries go through workers' compensation.

What GL covers and what it leaves out

Typical contractor GL coverage parts and common exclusions
Usually coveredUsually excluded or needs another policy
Third-party bodily injury from your operationsInjuries to your own employees (workers' comp)
Damage to someone else's propertyOwned or leased autos (commercial auto)
Personal and advertising injury, such as libel or slanderPollution (separate pollution policy)
Products and completed operations claims after you finishDesign or professional errors (professional liability)
Contractual liability for indemnity you agreed to in a contractEmployment practices claims (EPLI) and asbestos

Policies also cap what they pay. There is a per-occurrence limit and an aggregate limit for the policy period, and completed operations claims often have their own aggregate. The contract or subcontract usually spells out the minimum limits you must carry, so read the insurance exhibit before you bid, not after.

How GL works on a real job

Say a framing sub is working on the third floor of a mixed-use building. A bundle of studs slides off the deck and dents a parked car, and a piece clips a pedestrian on the sidewalk. The car owner and the pedestrian both file claims. The framer's GL carrier investigates, defends, and pays covered damages up to the limits. The framer pays its deductible or self-insured retention.

Now say the same framer finished the job eight months ago, and a balcony it built pulls away from the wall and injures a tenant. That is a completed operations claim. Whether it is covered depends on the policy in force, its wording, and any exclusions for the type of work. This is why owners often require subs to keep completed operations coverage for years after the job closes.

Additional insured and waiver of subrogation

Most subcontracts require the sub to name the GC and owner as additional insureds on its GL policy, so a claim against them from the sub's work can go to the sub's carrier. They also commonly ask for a waiver of subrogation, which stops the sub's insurer from suing the GC or owner to recover what it paid. Both are added by endorsement. A certificate that says "additional insured" without the endorsement behind it may not give the protection the contract promised. The guide on additional insured endorsements walks through it.

Common mistakes

  1. Assuming GL pays to fix your own bad work. It generally responds to resulting damage to others, not the cost of redoing your scope.
  2. Letting a sub start before the certificate and endorsements are on file.
  3. Not tracking expiration dates. A policy that lapses mid-job leaves a gap nobody notices until a claim.
  4. Missing the limits or endorsement wording the contract requires, which can be a breach even with no claim.
  5. Forgetting that hired or owned trucks need commercial auto coverage.

Related terms

See builder's risk insurance, subcontractor default insurance, self-insured retention, and insurance certificate tracking. Smart Business Automator tracks every sub's certificate, limits, and expiration dates so lapses get flagged before they become a problem; see subcontractor compliance automation.

Frequently asked questions

Is general liability insurance required for contractors?

Some states require it for licensing, and almost every GC, owner, and public agency requires it by contract before work starts. Check your state licensing agency and read the insurance requirements in each contract.

Does general liability cover my employees if they get hurt?

No. Employee injuries are covered by workers' compensation. GL is for people outside your company.

What is completed operations coverage?

It is the part of a GL policy that responds to injury or damage that happens after your work is finished and handed over, such as a failure caused by faulty workmanship.

What is the difference between occurrence and claims-made GL?

An occurrence policy responds to injury or damage that happens during the policy period, even if the claim comes later. A claims-made policy responds to claims made while the policy is in force, subject to its retroactive date. Most construction contracts ask for occurrence coverage.

Sources

  1. The Baldwin Group: Contractor general liability, what's covered and who needs it
Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment