Insurance and bonds

What is waiver of subrogation in construction?

A waiver of subrogation is a contract term where parties agree that their insurers will not sue each other to recover losses the insurer has paid, which keeps a covered loss from turning into a lawsuit between the owner, GC, and subs.

Two construction professionals review paper plans beside a tablet at a jobsite workbench.
Plan reviews connect field conditions, drawings, and the next decisions on a job. AI-generated illustration.

Subrogation is an insurer's right to step into its policyholder's shoes after paying a claim and sue whoever caused the loss. A waiver of subrogation gives that right up in advance. In construction, owners, GCs, and subs routinely agree to waive subrogation against each other, so that when a covered loss happens, insurance pays and the project team does not end up suing itself.

Two pieces have to line up. The contract must require the waiver, and the insurance policy must allow it, usually through an endorsement. A contract promise the policy does not support can leave the contractor in breach and personally on the hook.

How a waiver of subrogation works on a real job

Say a plumbing sub's torch starts a fire that damages $300,000 of finished work on a new building. The owner's builder's risk insurance pays the claim. Without a waiver, the builder's risk carrier could sue the plumbing sub to get its $300,000 back, and the sub's general liability carrier would defend. The GC, the sub, and the owner would spend the rest of the job in litigation.

With mutual waivers of subrogation in the prime contract and the subcontract, and policies endorsed to allow them, the builder's risk policy pays and that is the end of it. The cost of the loss is absorbed by the policy that was bought for exactly that risk.

Where waivers show up

  • Prime contracts: standard owner-contractor forms commonly include mutual waivers tied to property insurance.
  • Subcontracts: the GC flows the same waiver down through a flow-down clause.
  • Insurance requirements: subcontracts often require waiver of subrogation endorsements on general liability, auto, workers' compensation, and umbrella policies in favor of the owner and GC.
  • Certificates of insurance: the COI may state that a waiver applies, but the endorsement is what actually grants it.

Waiver of subrogation and workers' compensation

A waiver on workers' compensation stops the comp carrier from suing the GC or owner after paying an injured worker. Carriers often charge for this endorsement, and some states restrict or regulate waivers on comp policies. Ask your agent what applies in your state before agreeing to a blanket requirement.

Common mistakes and disputes

  1. Relying on the certificate alone. A box checked on a COI does not create coverage. Get the endorsement.
  2. Mismatched wording. The contract requires a waiver in favor of the owner, GC, and architect, but the endorsement only names the GC.
  3. Blanket versus scheduled endorsements. A blanket waiver applies when required by written contract. A scheduled waiver only covers named parties.
  4. Waivers limited to insured losses. Many waivers apply only to the extent of insurance proceeds. Deductibles and uninsured losses can still be fought over.
  5. Forgetting renewals. The endorsement has to be on the renewed policy too.

Related terms

See certificate of insurance, general liability insurance, hold harmless clause, and self-insured retention. Smart Business Automator tracks each sub's insurance documents and expiration dates so missing endorsements surface before work starts.

Frequently asked questions

What does waiver of subrogation mean in simple terms?

It means your insurance company agrees not to sue another party to recover money it paid on your claim, usually because your contract with that party requires it.

Does a waiver of subrogation cost extra?

Sometimes. Some insurers include blanket waivers in their policies, while others charge for the endorsement, especially on workers' compensation.

Is a waiver of subrogation the same as additional insured?

No. Additional insured status gives another party coverage under your policy. A waiver of subrogation stops your insurer from suing that party. Contracts often require both.

Where is waiver of subrogation found?

In the contract's insurance or waiver article, and on the policy as an endorsement. The certificate of insurance may reference it, but the endorsement is the proof.

Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment