Legal

What is a notice of commencement in construction?

A notice of commencement is a document the property owner records in the county land records before work starts, announcing the project and naming the owner, contractor, surety, and lender so that everyone down the chain knows where to send lien notices.

Two construction professionals review paper plans beside a tablet at a jobsite workbench.
Plan reviews connect field conditions, drawings, and the next decisions on a job. AI-generated illustration.

A notice of commencement (often shortened to NOC) is a public record that says, in effect, "work is about to start on this property, and here is who is involved." The owner signs it and records it with the county before the first crew shows up. Subcontractors and suppliers then use it to find the legal names and addresses they need for their own notice to owner or preliminary notice. Not every state uses one, and the rules differ among the states that do.

Think of it as the address book for the mechanics lien process. Without it, a drywall supplier three tiers down has to guess at the owner's exact legal name or the bonding company's address.

What Florida's notice of commencement requires

Florida is the state most contractors think of first, and its statute is a good model of how these documents work. Under section 713.13 of the Florida Statutes, only the owner may sign the notice, and it must be recorded before improvement of the property actually begins. A certified copy, or a notarized statement that it was filed, must also be posted at the job site.

  • Property: legal description, street address, and tax folio number if available.
  • Improvement: a general description of the work.
  • People: the owner and its interest, the contractor, any surety and bond amount, and any lender.
  • Notice agent: a person in Florida designated to receive legal notices.
  • Payment bond: a copy attached at recording if there is one.
  • Expiration: one year after recording unless the notice states a different date.

Two timing rules trip people up. If the work does not actually begin within 90 days after recording, the notice is void. And payments the owner makes after the notice expires are treated as improper payments, which can leave the owner paying twice. A lender funding the job must also see the notice recorded before it disburses construction money.

How it works on a real job

Say an owner hires a general contractor for a $650,000 retail buildout in Tampa. The GC's office prepares the notice, the owner signs it, and the GC records it at the county clerk the week before mobilization. A copy goes into the permit box on site, because the building department will want it before the first inspection.

Three weeks later, a storefront glazing sub signs on. Its office manager pulls the recorded notice, copies the owner's legal name, the lender, and the notice agent exactly, and serves a notice to owner within the statutory window. If the job later stalls and the owner has to extend the timeline past a year, the owner records an amended notice so later payments stay proper.

Common mistakes and disputes

  1. Letting the contractor sign. In Florida the statute says only the owner may sign.
  2. Recording late. Work that begins before recording can create priority fights between lien claimants and the lender.
  3. Ignoring the expiration date on a long job, which turns later owner payments into improper payments.
  4. Subs skipping the recorded notice and pulling names from the permit or the contract instead. A wrong owner name or a missed lender is an easy defense for the other side.
  5. Assuming every state has one. Many states have no notice of commencement at all, so check the mechanics lien rules by state before you rely on it.

Related terms

The notice of commencement opens a private job's lien process, and the notice of completion (in states that use one) often shortens the back end. In between sit lien waivers on every payment and, if things go wrong, a notice of intent to lien. Smart Business Automator keeps these documents attached to each project record, so the PM and the office see the same dates. See subcontractor compliance automation.

Frequently asked questions

Who files the notice of commencement?

The property owner, or an agent acting for the owner, records it. In Florida, only the owner may sign it, even when the contractor's office prepares the paperwork.

How long is a Florida notice of commencement good for?

One year after recording, unless the notice states a different expiration date. If work does not begin within 90 days of recording, the notice is void.

Do subcontractors file a notice of commencement?

No. Subs and suppliers read it. They use the names and addresses in it to serve their own notice to owner or preliminary notice.

Does a notice of commencement create a lien?

No. In Florida, recording it does not create a lien or encumbrance. It gives public notice that lien claims may be recorded and sets up how they rank.

Sources

  1. Florida Legislature: Florida Statutes 713.13, Notice of commencement
Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment