What is a request for qualifications (RFQ) in construction?

A request for qualifications (RFQ) asks contractors or design firms to submit their experience, team, capacity, and past performance, usually without a price, so the owner can pick a short list or a single firm to negotiate with.

Two construction professionals review paper plans beside a tablet at a jobsite workbench.
Plan reviews connect field conditions, drawings, and the next decisions on a job. AI-generated illustration.

An RFQ is a screening step. The owner asks firms to prove they can do the job before asking anyone what it will cost. Responses, often called a statement of qualifications, cover similar projects, key staff, safety record, bonding capacity, current workload, and references. The owner scores them, then either invites a short list to respond to a request for proposal or, for design services, picks the top firm and negotiates a fee.

One naming trap: in purchasing, RFQ also means request for quotation, a simple price request for materials or small jobs. Read the document title. A request for qualifications rarely asks for a price.

RFQs and the Brooks Act

Qualifications-based selection is required for federal architect-engineer services. Under the Brooks Act (40 U.S.C. 1101), federal policy is to publicly announce A-E needs and negotiate contracts based on demonstrated competence and qualifications at fair and reasonable prices. The FAR lists the evaluation criteria: professional qualifications, specialized experience and technical competence, capacity to finish on time, past performance, location and knowledge of the area (when enough qualified firms remain), and other appropriate criteria. The agency holds discussions with at least three of the most highly qualified firms before ranking them.

Many states and local governments use a similar qualifications-based approach for design services, and many use RFQs for CM at risk and design-build contractors too. The rules vary, so check the specific agency's procurement code.

How an RFQ response comes together

Say a $15M general contractor wants on a school district's CM at risk short list. The RFQ asks for five comparable projects in the last seven years, resumes for the proposed PM and superintendent, an EMR, bonding letter, and a narrative on preconstruction services. The GC's response leads with two occupied school renovations, names the exact superintendent who ran them, and includes a phasing diagram from one of them. A competitor submits its standard brochure with a list of 40 projects. The first one gets the interview.

Common RFQ mistakes

  • Naming staff you will not assign. Owners check, and swapping key people after award damages credibility.
  • Listing everything. Five closely relevant projects beat thirty loosely related ones.
  • Old or missing documents. Expired licenses, insurance, or a stale safety record can knock a response out.
  • Not answering the evaluation criteria. Organize the response the way the RFQ scores it.
  • Ignoring capacity. Owners want to know your current backlog leaves room for their project. See backlog.

Do not treat a short list as a win. The owner has only said you are capable. The next round, whether an RFP or an interview, is where price, approach, and chemistry get judged, and the firms left standing are all qualified. Use the time between rounds to visit the site, meet the end users if allowed, and sharpen the specific plan for this project.

Related terms

RFQs connect to prequalification, construction management at risk, best value procurement, and responsible bidder rules. Public pursuits are covered in state and local public works bidding basics. Smart Business Automator keeps licenses, insurance, and compliance records in one place, which makes assembling these packages faster.

Frequently asked questions

Does an RFQ include price?

A request for qualifications usually does not. Price comes later in an RFP or in negotiation. A request for quotation, which shares the acronym, is a price request.

What is a statement of qualifications?

It is the contractor's or designer's response to an RFQ: company overview, relevant projects, key personnel, safety and financial information, and references.

Why do public owners use qualifications-based selection for designers?

For federal A-E services it is required by the Brooks Act. The idea is that design quality drives construction cost and performance, so competence is chosen first and the fee is negotiated.

What happens after an RFQ?

Typically a short list, interviews, and then either an RFP with pricing or direct negotiation with the top-ranked firm.

Sources

  1. Cornell LII: 40 U.S.C. 1101, Policy (Brooks Act)
  2. Acquisition.gov: FAR 36.602-1 Selection criteria
Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment