Trade estimates

Concrete estimate template

A concrete estimate converts slab dimensions into cubic yards, adds waste, and prices the base, reinforcement, forms, placing, finishing, and cure as separate lines. Download this template as a CSV or print it.

Two construction professionals review paper plans beside a tablet at a jobsite workbench.
Plan reviews connect field conditions, drawings, and the next decisions on a job. AI-generated illustration.

A concrete estimate template turns length, width, and thickness into an order you can call in to the batch plant and a price you can stand behind. Each line covers one part of the pour: demo and haul-off, base, forms, rebar or mesh, ready-mix, placing and finishing, and curing or sealing. In the sample below, the ready-mix is about a fifth of the total. Labor, demo, base, and reinforcement make up the rest, and that is where flatwork estimates usually go wrong.

Here is the core math. Length in feet, times width in feet, times thickness in inches divided by 12, gives cubic feet. Divide by 27 to get cubic yards. A 40 by 20 foot driveway at 4 inches is 266.67 cubic feet, or 9.88 cubic yards before waste. Get that number right and the rest of the sheet follows from it.

What a concrete estimate is for

The estimate is your cost build and your material order in one place. It records the dimensions, the thickness, the mix, the reinforcement spacing, and the finish you priced. The customer or general contractor gets a proposal with scope and exclusions. The estimate stays with you so that when the pour runs short or the finishers run long, you can see why.

It is also where you protect yourself from what is under the ground. Soft subgrade, buried footings, and old slabs show up during excavation. Put unit prices on the estimate for extra base per ton or yard, extra excavation, and extra concrete per yard over the estimated quantity, and carry those into the contract. Then the surprise is a line on the invoice, not a fight.

How to fill in each column

  • Item: a code like C-01, in pour order so the crew can read the sheet top to bottom.
  • Description: the scope with dimensions and spec, such as "4,000 psi ready-mix, driveway 40 x 20 ft at 4 in." Write the mix strength, slump, and any air entrainment the job calls for.
  • Net qty: the calculated quantity before waste: CY for concrete and base, LF for forms and rebar, SF for finishing and sealing.
  • Waste: allowance for subgrade variation, over-excavation, spillage, and laps. Thin slabs on uneven grade need more than a footing poured in a clean trench.
  • Order qty: net quantity plus waste, rounded up to what the supplier sells. Ready-mix is usually ordered in fractions of a yard; rebar comes in full-length sticks.
  • Unit cost: your current material price per unit. Get a fresh ready-mix quote, since prices and fuel surcharges move.
  • Labor: crew cost in dollars for the line. Finishing labor is often priced per square foot.
  • Line total: order quantity times unit cost, plus labor.

Concrete pricing tips

Price the pump, the conveyor, or the extra wheelbarrow crew as its own line whenever the truck cannot back up to the forms. Price cold weather protection (blankets, heated enclosures, accelerators) and hot weather measures as conditions, not as padding hidden in the yard price. And put saw-cutting control joints on the sheet. Saw-cutting and grinding concrete fall under OSHA's respirable crystalline silica standard for construction (29 CFR 1926.1153), and its Table 1 sets the controls for saws and grinders, such as water fed to the blade, which affects the equipment you rent; see silica exposure rules for contractors.

Track yards ordered against yards placed on every job and set your waste factors from that record. A finisher who knows the crew's real production rate per square foot is worth more than any rule of thumb. For overhead, margin, and minimum job size, read how to price concrete jobs.

Common concrete estimate mistakes

  1. Calculating yards from the nominal thickness when the subgrade is low, so the truck runs out with 10 feet to go.
  2. Forgetting the base, or pricing it in cubic yards when the supplier sells by the ton without converting.
  3. Leaving out demo and disposal of the old slab, which is heavy and expensive to haul.
  4. Pricing rebar by the area instead of by the bar layout, which misses laps, dowels, and edge bars.
  5. No permit line where the city requires one for a driveway approach or sidewalk.

Related forms

When the forms are pulled, bill the job with the concrete invoice template. The material delivery log template is a simple way to keep ready-mix tickets with the job. If you are replacing spreadsheets, start with concrete software.

Smart Business Automator moves a signed concrete estimate into the job with its quantities and unit prices, so field and office track the same yards. See estimate to project handoff automation.

Concrete flatwork estimate

Download CSV
ItemDescriptionNet qtyUnitWasteOrder qtyUnit costLaborLine total
C-01Remove existing asphalt driveway, 800 SF, load and haul800SF0%8000.751,200.001,800.00
C-02Compacted gravel base, 4 in, 40 x 20 ft9.88CY10%1148.00400.00928.00
C-03Edge forms, 2x4, three sides100LF0%1001.20300.00420.00
C-04#4 rebar at 18 in each way, on chairs, laps included in waste1,160LF10%1,2800.85580.001,668.00
C-054,000 psi ready-mix, driveway 40 x 20 ft at 4 in9.88CY8%10.75175.000.001,881.25
C-06Place, broom finish, saw-cut control joints800SF0%8000.002,400.002,400.00
C-07Curing compound and sealer800SF0%8000.1580.00200.00
  • Sample data only. Quantities, prices, and labor are made up for illustration.
  • Cubic yards = Length (ft) x Width (ft) x Thickness (in) / 12 / 27. For C-05: 40 x 20 x 4 / 12 / 27 = 9.88 CY.
  • Order qty = Net qty x (1 + Waste), rounded up to what the supplier sells. Line total = (Order qty x Unit cost) + Labor.
  • Rebar layout for C-04: 15 bars x 40 ft plus 28 bars x 20 ft = 1,160 LF, ordered as 64 sticks of 20 ft. Sample subtotal: 9,297.25.
  • Below the lines, add unit prices for extra excavation, extra base, and extra concrete per yard, plus permit, pump, overhead, profit, and tax.

Frequently asked questions

How do I calculate cubic yards of concrete?

Multiply length by width in feet, multiply by thickness in inches divided by 12, and divide the result by 27. Then add waste for subgrade variation and spillage.

How much waste should I add to a concrete order?

It depends on the pour. Slabs on uneven grade need more than footings in clean trenches. Track ordered versus placed yards on your own jobs and set your factor from that.

Should the concrete estimate include the base and rebar?

Yes, as separate lines. Base and reinforcement are real costs that change with the soil and the design, and listing them makes the price easier to defend.

Can I open this concrete estimate template in Excel?

Yes. Download the CSV and open it in Excel or Google Sheets, then add formulas for cubic yards, order quantity, and line total.

Sources

  1. 29 CFR 1926.1153: Respirable crystalline silica (construction)
Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment