Pricing

Contractor Foreman pricing: what you will actually pay

Contractor Foreman sells five plans priced for the whole company by user band, not per seat. Annual billing is cheaper, Basic is annual only, and the top plan covers unlimited users.

A project engineer in a hardhat and safety vest uses a rugged tablet beside steel wall framing.
Capture field information where the work happens, then route it to the people who need it. AI-generated illustration.

Contractor Foreman prices its software in bands: one monthly fee for the whole company covers a set number of users, from a one-user Basic plan up to an Unlimited plan. On its pricing page, checked in October 2026, annual billing works out to Basic at $49 a month for 1 user, Standard at $105 for up to 3 users, Plus at $166 for up to 8, Pro at $221 for up to 15, and Unlimited at $332. Monthly billing runs $139, $199, $279, and $399 for the same four upper tiers, and Basic is not offered month to month.

The vendor states that the listed fee is for the company as a whole, not per person, and that the price does not rise as you add projects. The sections below cover what moves the total, the trial and refund terms, and the questions to settle before you sign.

How Contractor Foreman structures its plans

The key point for budgeting: you are not paying per person. You pay for a seat band. A company with 6 office and field users would land in the plan that covers 8 users, and a company with 9 users would move up to the 15-user band. That makes Contractor Foreman cheap per head for a team sitting at the top of a band and less efficient for one that barely spills over a threshold.

Contractor Foreman pricing page, checked October 2026. Prices per month.
PlanUsers includedBilled annuallyBilled monthly
Basic1$49Not offered
StandardUp to 3$105$139
PlusUp to 8$166$199
ProUp to 15$221$279
UnlimitedUnlimited$332$399

Some review sites list different figures for these tiers, captured at different times. Price from the vendor's own page on the day you buy, and get the number for your user band in writing. Pro and Unlimited also list free setup and implementation, and the number of included one-on-one training sessions rises with the plan.

What drives the cost up or down

  • User count. This is the main lever. Count everyone who needs a login: project managers, the office manager, the bookkeeper, superintendents, and any foremen who will submit daily logs or time cards.
  • Billing term. Annual billing is the cheaper rate. On the annual plans the first 30 days are free and the first charge comes when the trial ends; monthly plans are charged at signup. Basic is annual only.
  • Payment processing. Contractor Foreman lists Stripe card fees of 2.9% plus $0.30 for Visa, Mastercard, and Discover, 3.9% plus $0.30 for American Express, and ACH at 1% plus $0.30, capped at $10. If you plan to collect progress payments through the software, those fees belong in your annual cost.
  • Training time. The money-back guarantee described below requires live calls and real use of the software, so plan for staff hours during setup even if there is no setup fee.

Trial, guarantee, and renewal

Annual plans include a 30-day free trial. Annual Plus, Pro, and Unlimited plans carry a 100-day money-back guarantee, and Plus, Pro, and Unlimited monthly plans carry a 30-day one. The guarantee comes with conditions in Contractor Foreman's refund policy for trials started after February 19, 2026. For annual plans, you need a demo or kickoff call within 7 days of signup, at least one live one-on-one training call, an estimate, project, time card, and daily log created within 45 days of the trial start, and at least 10 active days in the 30 days before you ask for a refund. Read the current policy before you sign, and ask how renewal pricing works for your plan.

A worked example

Say a remodeling company runs 4 to 5 jobs at a time with an owner, an office manager, one project manager, and three lead carpenters who log hours and photos. That is 6 users, which puts the company in the 8-user Plus band. At the listed $166 a month billed annually, the subscription runs about $1,992 for the year (the pricing page shows $1,997 at renewal). Add card fees if homeowners pay deposits by card: on $300,000 of card payments a year, 2.9% is $8,700 before the per-transaction charge, which can exceed the software itself. Many contractors push large payments to ACH for that reason.

Now say the company hires two more field leads. At 8 users it still fits in Plus. Hire a ninth person and the next step is the 15-user Pro band. Budget for where headcount will be in 12 months, not where it is today.

Strengths and limits worth weighing

Contractor Foreman's appeal is breadth for the money. Its pricing page lists estimating, takeoffs, bids, purchase orders, change orders, progress invoicing with retainage and AIA G702 and G703 billing, daily logs, time cards, safety meetings, and job costing reports, with unlimited projects at a fixed price. A small general contractor can run estimating through invoicing in one system without stacking several subscriptions.

Check the limits that matter to you during the trial. Basic is a single user. Basic and Standard do not include local material pricing in the material database. The integration list covers QuickBooks Online, Zapier, Stripe, Gusto, MS Project, CompanyCam, Google and Outlook calendars, and Angi Leads, with Xero listed as coming in December 2026, so confirm your accounting setup is supported today. If your crews work in areas with poor signal, test the mobile app on a real job site.

Hidden costs to ask about

  1. What is the exact price for our user count, billed annually and monthly, and what will it be at renewal?
  2. Is there any onboarding, data import, or training fee if we need more than the included sessions?
  3. What are the card and ACH processing rates, and can we pass the fee to the customer?
  4. Does the accounting integration cost extra, and does it support our version of QuickBooks?
  5. What happens to our data if we cancel, and in what format can we export it?

How it compares and where Smart Business Automator fits

If seat-band pricing does not fit your headcount, see Contractor Foreman alternatives or the head-to-head Contractor Foreman vs Buildertrend. For a broader view of what contractors spend on software, read how much construction software costs and look at the total cost of ownership, not just the monthly line.

Smart Business Automator is a newer product priced per user per month (Starter $19, Professional $40, Business $67, Enterprise $100), covering project tracking, invoicing, subcontractor tracking, change orders, job costing and WIP views, and AI help with paperwork such as daily log summaries. Per-user pricing grows one seat at a time, which can suit a team that would otherwise straddle a band. See our pricing.

Frequently asked questions

Is Contractor Foreman priced per user?

No. Its pricing page says the listed fee covers the whole company, with each plan including a band of users (1, up to 3, up to 8, up to 15, or unlimited). A team just over a threshold pays for the next tier.

Does Contractor Foreman have a free trial?

Yes. Annual plans are free for the first 30 days. Annual Plus, Pro, and Unlimited plans also carry a 100-day money-back guarantee, subject to training and usage conditions in the refund policy.

Can I pay Contractor Foreman monthly?

Yes, except on Basic. As checked in October 2026, monthly billing was $139 for Standard, $199 for Plus, $279 for Pro, and $399 for Unlimited. Monthly plans are charged at signup.

Why do Contractor Foreman prices differ between websites?

Review sites capture prices at different times and do not always separate annual from monthly rates. Use the vendor's pricing page and get the current price in writing before you commit.

Sources

  1. Contractor Foreman: Pricing (checked October 2026)
  2. Contractor Foreman: Refund and cancellation policy (checked October 2026)
Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment