Head to head

Contractor Foreman vs Buildertrend

Contractor Foreman is a broad, low-entry-price tool for GCs, subs, and trade contractors, with tiers set mostly by user count. Buildertrend focuses on residential builders and the homeowner experience, and its pricing could not be confirmed from its site in October 2026.

A project engineer in a hardhat and safety vest uses a rugged tablet beside steel wall framing.
Capture field information where the work happens, then route it to the people who need it. AI-generated illustration.

If you want a long feature list at a published price, Contractor Foreman is the easier buy: plans start at $49 a month billed annually for one user and run to $399 a month on monthly billing for unlimited users. It is pitched at general contractors, subcontractors, trade contractors, and service contractors. Buildertrend is built around residential building and remodeling, with tools for specs, selections, and client updates. We could not load Buildertrend's pricing page in October 2026, so plan on a quote. A commercial sub billing AIA pay apps and a custom home builder with demanding clients will likely land on different answers.

At a glance

From vendor pages checked October 2026
Contractor ForemanBuildertrend
Main audienceGCs, subs, trade contractors, service contractorsResidential builders and remodelers
Entry price$49/mo billed annually (Basic, 1 user)Not confirmed (pricing page could not be loaded)
Top published planUnlimited: $332/mo annual or $399/mo monthly, unlimited usersAsk in quote
How tiers differMainly user count, training sessions, guarantee lengthAsk in quote
ProjectsUnlimited projects at a fixed priceAsk in quote
Trial and guarantee30 days free on annual plans; 100-day guarantee on Plus and up (annual)Ask in quote
Commercial billingSchedule of values, progress invoicing, retainage, AIA G702/G703Not confirmed from a vendor page
Client toolsClient portalSelections, AI client progress updates, shared plans, signatures

Pricing compared

Contractor Foreman publishes five plans. Billed annually: Basic $49 a month (1 user), Standard $105 (up to 3), Plus $166 (up to 8), Pro $221 (up to 15), and Unlimited $332. Billed monthly: Standard $139, Plus $199, Pro $279, and Unlimited $399. Basic is annual only. Annual plans are free for the first 30 days, and the page lists free setup on Pro and Unlimited. The page also offers non-profit pricing (it mentions both free access and a discount, so confirm which applies) and 50 percent off additional accounts for companies you own.

Watch two cost lines. The Local Material Database page says Basic and Standard plans do not include material pricing. And card payments through the built-in Stripe processing are listed at 2.9 percent plus $0.30 for Visa, Mastercard, and Discover, 3.9 percent plus $0.30 for American Express, and 1 percent plus $0.30 (capped at $10) for ACH. On a $40,000 progress invoice paid by card, that is about $1,160 in fees, so steer larger payments to ACH.

Buildertrend did not let us load its pricing page, and we do not repeat unverified prices. Get the plan, users, onboarding fee, processing rates, and term in writing, then compare first-year cost. Our guide on how much construction software costs covers what to ask.

Feature coverage

Contractor Foreman's feature list is long. Project management covers to-dos, a client portal, scheduling, service tickets, punch lists, work orders, permits, daily logs, inspections, and schedule of values. Financials include estimates, takeoffs, bids, purchase orders, change orders, progress invoicing, retainage, subcontracts, and AIA G702 and G703 invoicing. Documents cover photo and drawing markup, equipment logs, forms, RFIs, and submittals. It also lists time cards, crew scheduling, incidents, safety meetings, and job costing reports.

That breadth suits a commercial trade sub. Say an electrical contractor is billing a GC on a $310,000 AIA G702 with 10 percent retainage, logging RFIs, and running safety meetings. It can do all of that in one place.

Buildertrend's publicly loadable description, from CoConstruct's transition page, covers specs, selections, task management, AI-powered client progress updates, shared plans, signatures and markup, and budgeting with real-time cost tracking. It reads as a toolset for residential jobs where the client is a homeowner, not a GC's project manager.

Integrations

Contractor Foreman lists QuickBooks, Zapier, Stripe, Gusto, MS Project, CompanyCam, Google and Outlook calendars, and Angi Leads. Xero is shown as coming in December 2026, so do not count on it today. We could not confirm Buildertrend's integration list from a page we could load, so ask the rep to show the accounting sync live.

Strengths and limits

  • Contractor Foreman strength: published prices, a low entry point, unlimited projects, and a 100-day money-back guarantee on annual Plus, Pro, and Unlimited plans.
  • Contractor Foreman strength: commercial billing tools (SOV, retainage, AIA G702/G703) alongside field and safety tools.
  • Contractor Foreman limit: you move up tiers as your office headcount grows, and lower tiers skip material database pricing.
  • Buildertrend strength: homeowner-facing tools for selections and progress updates.
  • Buildertrend strength: a clear path for CoConstruct users.
  • Buildertrend limit: plan and price details could not be verified from its own site.

How to run a fair test

Feature lists blur together. A one-week test on your own data does not. Pick a job that is about to start, load its budget, and push the same paperwork through each tool: one estimate, two change orders, a week of daily logs, and the first invoice. Time how long each step takes the person who actually does it, not the owner watching the demo.

Then look at the output. Does the invoice match the format your clients or GCs require? Does the change order update the budget without a second entry? Can a homeowner or a GC's PM open what you send without calling the office? The tool that wins that test is usually the right one.

Who should pick which

  1. Small GC or trade sub watching cost: Contractor Foreman. You can price it before calling anyone.
  2. Commercial sub billing pay apps with retainage: Contractor Foreman lists the billing tools you need. See also how to fill out AIA G702 and G703.
  3. Custom builder or remodeler selling a premium client experience: Buildertrend deserves a demo.
  4. Service plus project contractor: Contractor Foreman lists service tickets and work orders, which helps if you mix repair calls with projects.

Still deciding? Read Contractor Foreman alternatives and Procore vs Buildertrend.

Smart Business Automator is a newer option with per-user pricing (Starter $19, Professional $40, Business $67, Enterprise $100 a month). It handles project tracking, invoicing, subcontractor and shipment tracking, change orders, job costing and WIP views, compliance and certified payroll preparation, plus AI help with RFI drafting and risk alerts. It has a shorter feature list than Contractor Foreman and no homeowner selections module. See our pricing.

Frequently asked questions

How much is Contractor Foreman per month?

As of October 2026, plans run from $49 a month billed annually (Basic, 1 user) to $332 a month billed annually or $399 billed monthly (Unlimited users).

Does Contractor Foreman have a free trial?

Its pricing page says annual plans are free for 30 days before the first charge. Monthly plans are charged right away. Plus, Pro, and Unlimited monthly plans carry a 30-day money-back guarantee, and the refund policy lists usage and training conditions.

Does Contractor Foreman do AIA billing?

Yes. Its feature list includes schedule of values, progress invoicing, retainage, and AIA G702/G703 invoicing.

Does Contractor Foreman integrate with Xero?

Its pricing page lists Xero as coming in December 2026. QuickBooks is listed as available now.

Why could Buildertrend pricing not be confirmed?

Buildertrend's pricing page blocked access when checked in October 2026, and this page only states prices verified on the vendor's own site. Ask Buildertrend for a written quote.

Sources

  1. Contractor Foreman: Pricing and features (checked October 2026)
  2. CoConstruct: Transition to Buildertrend page (checked October 2026)
  3. Buildertrend: Pricing (could not be loaded, October 2026)
Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment