Fieldwire pricing: plans, per-user costs, and what each tier adds
Fieldwire has a free Basic plan for up to 5 users and 3 projects, then paid plans at $39, $64, and $89 per user per month billed annually. RFIs, submittals, and change orders sit on the top published tier.
Capture field information where the work happens, then route it to the people who need it. AI-generated illustration.
Fieldwire charges per user. As of October 2026, its pricing page lists a free Basic plan, then Pro at $39, Business at $64, and Business Plus at $89 per user per month, billed annually. Monthly billing is offered through a toggle on the page, and Enterprise terms are custom. The plan you need depends mostly on whether you want forms and integrations (Business) or RFIs, submittals, change orders, and budget (Business Plus).
Fieldwire plans at a glance
Fieldwire published pricing in U.S. dollars, checked October 2026.
Plan
Price per user per month (billed annually)
Limits
Key additions
Basic
$0
5 users, 3 projects, 100 sheets
Plan viewing, tasks, specifications, files and photos, checklists
Pro
$39
Unlimited projects and sheets, pay per user
Reports and exports, sheet compare, project templates, custom task statuses
Unlimited user options, tailored training, dedicated success team, API access, SSO
The page also has a monthly billing toggle, but the monthly per-user prices did not appear in the page content we could read, so we have not listed them. Fieldwire's FAQ says paid customers are billed monthly or annually based on license count, and that adding users adds charges.
What each tier is good for
Basic (free)
Basic is a real tool, not just a trial. A small team can view plans, assign tasks, and share photos and checklists on up to 3 projects. The 100-sheet cap is the limit most teams hit first: a full drawing set with every discipline can pass that number on one larger job.
Pro
Pro removes the project and sheet caps and adds reports and exports, sheet compare, and project templates. For a specialty contractor whose field team mostly needs current drawings and a punch and task list, Pro covers the job. See punch list and as-built drawings for the workflows it supports.
Business
Business adds custom forms, app integrations, a BIM viewer, and custom task fields. Forms are what most companies use for daily reports, safety inspections, and QA checklists, and integrations are how data gets to the rest of your systems. If you need either, Business is your floor.
Business Plus
Business Plus adds RFIs, submittals, change orders, and budget. That moves Fieldwire from a field tool toward project management. A general contractor that wants RFI and submittal logs in the same place as the drawings will be pricing this tier.
What drives the cost
User count. Every paid user is a license. Fieldwire says new users add charges unless they already have their own paying account, which matters when subcontractors bring their own licenses.
Tier. The jump from Pro to Business Plus is $50 per user per month. Put only the people who need RFIs and submittals on the higher tier if Fieldwire allows mixed tiers, and ask.
Billing term. The published prices are for annual billing.
Enterprise extras. API access and SSO are listed as quote-based, so an IT requirement can push you into a custom contract.
A worked example
Say a mechanical subcontractor has 3 project managers, 2 superintendents, and 10 foremen who need current drawings and task lists. On Pro, 15 users at $39 is $585 a month, or $7,020 a year. If the company wants custom forms for daily reports and safety checks, Business at $64 brings that to $960 a month, or $11,520 a year. If the 3 project managers also want RFIs and submittals in Fieldwire, and the rest stay on Business (ask whether that mix is allowed), the bill rises by $75 a month for those 3 seats.
Notice what the per-user model rewards: deciding carefully who needs a paid seat. A foreman who only opens drawings twice a week costs the same as a project manager who lives in the app. Some companies give field leads a seat and let crew members see plans through the lead's tablet. Others license everyone so tasks can be assigned to individuals. Either approach can work, but decide before you sign, because the annual bill scales with it.
Compare that with a 4-person crew doing small service and tenant improvement work on 2 or 3 active jobs. They may fit inside the free Basic plan until the sheet cap bites.
Hidden costs to ask about
Monthly billing rates for your tier, since the page did not show them in the content we read.
Whether you can mix tiers on one account, so only some users pay for Business Plus.
Training and onboarding costs. Fieldwire offers a free help center and says customized training is available; ask whether it is priced separately.
Integration costs on the other side. Connecting Fieldwire to accounting or scheduling tools may require a paid plan in those tools too.
Custom pricing. Fieldwire says it offers custom plans across projects or companies starting at 50 licenses.
Strengths and limits
Fieldwire's strengths are a usable free tier, published per-user pricing, and a strong plan-viewing and task workflow for the field. It supports 19 languages, per its FAQ, which helps on mixed-language crews.
The limits come from per-user pricing at scale and from tier placement. RFIs, submittals, change orders, and budget sit on the $89 tier, so a company that wants those across a large team pays the top rate on many seats. Fieldwire is not an accounting or estimating system, so most contractors run it alongside other software.
Alternatives and where Smart Business Automator fits
See Fieldwire alternatives for other field and project tools, or how much construction software costs for a wider budget view. Smart Business Automator is a newer product, also priced per user per month (Starter $19, Professional $40, Business $67, Enterprise $100), with project tracking, change orders, invoicing, job costing and WIP views, and AI help drafting RFIs and summarizing daily logs. It is not a drawing viewer, so a team that lives in plan sheets should weigh that. Details are on our pricing page.
Frequently asked questions
Is Fieldwire free?+
Fieldwire has a free Basic plan for up to 5 users, 3 projects, and 100 sheets. Paid plans start at $39 per user per month billed annually, as of October 2026.
Which Fieldwire plan includes RFIs and submittals?+
RFIs, submittals, change orders, and budget are on Business Plus, listed at $89 per user per month billed annually.
Can I cancel Fieldwire anytime?+
Fieldwire's FAQ says you can cancel a premium plan at any time from your Account tab. Check how annual prepayment is handled before you commit.
Does Fieldwire offer volume pricing?+
Fieldwire says it offers custom pricing plans across projects or companies starting at 50 licenses, and Enterprise terms are quote-based.
A Kiewit-led joint venture just took a major segment of the $7 billion Texas light rail program, one of the largest North American transit awards of 2026. This deep-dive walks contractors through the corridor plans, prime contractor structure, subcontracting opportunities across tunneling, stations, systems, and signaling, prequalification steps, and the Smart Business Automator transit bid board every tier-2 and tier-3 contractor chasing Texas work should have open.
Starts muted when the player comes into view.
Read the full episode transcript
Published transcript from Scaling Legends. It may contain transcription errors. View the source transcript.
So the biggest risk on a $7 billion transit project isn't actually laying the rail. Right. It's usually the tiny details that catch people. Exactly. I mean, think about what happens when a local subcontractor's concrete pour for an elevated structure is off by like a quarter of an inch. Oh, man. Suddenly a multi -million dollar transit car won't interface with the track. Yeah, and the entire critical path just halts. Then that interface dispute immediately spirals into a massive legal bloodbath over, you know, who's actually paying to rip up the concrete. That's the reality of mega project heavy civil work. It really is. It's this high stakes environment where margins for error simply... They just don't exist. Right. Especially when we were looking at Kiewit. Right. A total titan in the industry.
Yeah. Calling in around $15 billion in revenue. And they just locked down a major segment of the Texas light rail program. I mean, we're talking a $7 billion program spend here. $7 billion. Yep. And they are not executing every granular detail of this themselves, obviously. They're the orchestrators. That means they're actively looking for tiers of specialized regional subcontractors to absorb that ground -level execution. Which is exactly why we are jumping into this deep dive today. This is phase one of a multi -year, multi -corridor plan linking Dallas -Fort Worth, Houston, Austin, and San Antonio. It's massive. It's huge. So if you are a construction business owner, a subcontractor, or a specialty trade anywhere near Texas, what we are unpacking today
is your literal opportunity map. Absolutely. You really can't afford to ignore it. Right. Because if you choose to sit this one out because it feels too complex, well, your competitors are going to secure a five -year backlog. They'll build this fortress of heavy civil experience and leave you fighting for scraps in the commercial sector. Yeah. And to really grasp how to win a piece of this, you have to visualize what Kiewit is actually building. It's helpful to think of a transit line not as a road, but as a horizontal skyscraper stretched across the state of Texas. Oh, I really like that. Horizontal skyscraper. Yeah, it has all the exact same interdependent... Layers, you know, just laid out literally. That horizontal skyscraper analogy perfectly captures the complexity. Because you have the deep foundation, which here is the tunneling and ground stabilization.
Then you have the structural framing, you know, your elevated guideways and the physical stations. You have the nervous system, which is the track work, the electrification, the signaling. Don't forget communications. Right, communications too. And finally, you have the operational interface dealing with the rolling stock and long -term maintenance. So let's break those layers down into actual trades. Where are the entry points for the subs listening right now? Well, if you look below ground, tunneling is a massive sector. I mean, Kiewit will self -perform a lot of the heavy civil, sure. But they constantly look for specialty tunnel bore operations, ground support engineering, and spray applied. concrete liners. So any contractor specializing in deep underground stabilization has a massive runway here. Oh,
huge. And then moving up to the stations, this is where highly capable commercial subs can actually make the pivot into infrastructure. Because, I mean, building a transit station isn't fundamentally different from building a complex commercial facility, right? Not at all. You still need massive structural steel packages, heavy -duty architectural glazing, and those high -wear finishes that can withstand what? 50 ,000 commuters a day? Exactly. And the mechanical, electrical, and plumbing scopes on these stations are just enormous. Plus, you have the specialized installation of transit -grade escalators and elevators. Right, but the environment must shift dramatically when you get to the transit -specific system. Oh, it completely changes. We're looking at intricate fiber -optic network installations, traction power substations, and the physical track work itself. Like the
rail, the ballast, the fastening systems. Yeah, and those highly complex grade crossings where the rail intersects with active local highways. It's intense. So I want to push back on this. for a second. If you're listening right now and running a highly successful, say, $50 million regional operation, hearing this list of specialized scopes sounds really intimidating. Oh, definitely. How does a regional subcontractor actually get their foot in the door with a prime like Kiewit without getting completely crushed by the bureaucracy? Well, you got to view the process through Kiewit's lens. Mega projects run entirely on risk mitigation. Okay. Makes sense. The prime contractor's biggest fear is not that a subcontractor's bid is 5 % higher than the competition. Their ultimate nightmare
is a sub winning the bid, getting six months into a critical path scope, and financially collapsing. Oh, wow. Yeah, because that derails the entire $7 billion schedule. Exactly. So to get in the door, you have to survive their risk mitigation fortress. Let's talk about the bouncers at that door, then. There's a pretty rigid prequalification checklist, right? They're rigid. Texas DOT prequalification is the absolute baseline. Then you have to navigate the Kiewit supplier quality portal. And what about DBE certifications? Huge advantage. If you hold a... disadvantaged business enterprise certification, you have a distinct leg up because federal and state funds mandate really aggressive DBE participation goals on these mega projects.
Got it. And safety is another big one. Safety is an absolute gatekeeper. Your total recordable incident rate, your TRIR, must be strictly under 1 .5. Wow. Strictly under 1 .5. Yeah. If you submit a pre -qualification package with like the 1 .6, the procurement algorithms will probably filter you out before human eyes ever even see your pricing. That's brutal. But I think the hurdle that genuinely shocks regional contractors trying to step up into heavy civil is the bonding capacity requirement. Oh, the bonding math on these transit projects is just brutal. Right, because a lot of established commercial contractors assume bonding is a simple one -to -one ratio. They figure if they want to bid on a $20 million task order for Station Steel, they just need to show $20 million in available bonding capacity. And that assumption will get you disqualified
immediately. Really? Just right off the bat? Oh, yeah. In heavy civil transit subcontracting, primes typically require two to three times the project size in overall available bonding capacity. Wait, so for that $20 million task order, you must prove you have $40 million to $60 million in bonding capacity. Exactly. $40 to $60 million. Which sounds completely unreasonable on the surface. I mean, if the scoop of work is $20 million... Why is the Surety and the Prime demanding a $60 million safety net? They are calculating your concurrent risk. The Prime knows this transit job is not the only project on your books. Right. You might have three other commercial builds happening simultaneously. Exactly. They're stress testing your financial mass. They're asking, what happens if an owner on one of your other
projects delays a $2 million payment by 90 days? Oh, Iso. Do you have the liquidity and the financial buffer to keep making payroll, keep buying steel, and keep your crews mobilized on Kiewit's job? Precisely. That multiplier proves you can absorb a massive financial shock elsewhere without defaulting on their critical path. So how does a construction business owner actually bridge that gap? Because you don't just walk into a surety's office and demand a $60 million line. No, definitely not. You have to start preparing your balance sheet today. Yeah. Means sitting down with your construction CPA, getting fully audited financials, not just reviewed, but audited. And cleaning up your work in progress schedules too, I imagine. Yep. You have to hand the surety a narrative that proves your cash flow is practically bulletproof. That
preparation is so critical because once you lock in the financial backing, you hit the execution constraints. I mean, having the bonding capacity is just the permission to play. Right. You still need the manpower and the machinery to move the dirt. And on a multi -year linear project, the cost models for both are incredibly volatile. Let's dive into that labor volatility first. Since this is public infrastructure, Davis -Bacon prevailing rages apply. Now, every seasoned contractor knows how prevailing wages work, but the complexity really skyrockets when your job site is a rail line stretching across different metro regions. Yeah, because you are crossing county lines. The rates for heavy equipment operators, iron workers, and laborers are rigidly fixed by the specific county where the work takes place. On
a multi -corridor transit project, you might be laying track through five different counties. So the prevailing wage rate for a concrete finisher could literally change at like... Mile marker 42. Literally, yes. And if your estimating team flatlines the labor rate across the entire two -year bid based on your home county, you are going to underbid the job. Oh, you'll win the work, but you'll bleed cash every single week because you are legally mandated to pay higher wages in adjacent counties that you never even budgeted for. And tracking those shifting county -by -county wage indices manually is a recipe for a massive margin fade. Leveraging Smart Business Automator's Market Intelligence report gives you the exact prevailing wage mapping required to build a resilient, multi -county labor cost model without all the guesswork. That is so true.
Eliminating that bidding risk is the only way to survive a multi -year execution. And the same level of rigorous pre -planning applies to your heavy equipment. Oh, absolutely. You are dealing with specialized machinery that simply does not exist on the rental market. Right. You can't just call up your local equipment yard and ask them to drop off a specialized tunnel boring machine or massive grade beams by next Tuesday. They'd laugh you off the phone. Exactly. The supply chain reality of a mega project requires 12 to 18 month lead times for specialized capital expenditures. 18 months. Wow. Yeah. If you wait until Kiewit officially awards you the subcontract to place the order for your heavy machinery, you are instantly a year and a half behind schedule. Which means you have to pre -position. You have
to know the prime's execution schedule and align your procurement strategy months before the dirt actually moves. And again, you can't do that blindly. You really have to rely on data. Definitely. Which is why cross -referencing your procurement timeline with Smart Business Automator's Market Intelligence Report regarding heavy equipment lead times is so crucial. It allows you to see the supply chain bottlenecks before they crush your mobilization schedule. Spot on. So we've established the internal hurdles, you know, securing the multi -tiered bonding, modeling the shifting labor rates, and pre -positioning those 18 -month equipment lead times. But navigating your own operations is only half the battle. You have to look at the external battlefield, too. Oh, yeah. The threat landscape on a $7 billion program is incredibly intense. You're no longer just
bidding against the three local guys you usually see at the municipal pre -bid meetings. When a program hits this financial magnitude, the international heavy hitters mobilize. We're talking about operations like Skanska USA, Granite, Flatiron, Herzog, and Trailer Bros. Right. These are massive, highly sophisticated organizations. How does a regional listener carve out a piece of the pie when these giants are casting shadows over the entire project? You don't try to beat them on scale. You beat them on agility and localization. integration okay explain that well the mega firms have incredible balance sheets but they often lack deep, decades -long relationships with regional material suppliers. So if you have an ironclad local supply chain that guarantees aggressive pricing on raw materials, you bring immediate
value. Or I guess you could form strategic joint ventures. Exactly. You might hold a specific, highly vetted DBE certification combined with a specialized capability like complex traction power substations that the big players usually prefer to sub out anyway. You find the gap in their operations operational armor, and you fill it. That makes a lot of sense. But even when you secure the contract and outmaneuver the giants, the field is covered in operational landmines. What are the specific traps built into these mega project contracts that our listeners need to engineer out of their bids? The design -build rap is arguably the most dangerous. I mean, in traditional commercial construction, you bid on a completed set of engineered drawings. Sure. On a transit megaproject using a design -build delivery method, you're often putting shovels
in the ground while the upstream engineering is only like 60 % complete. Oh man, which guarantees design changes, clashes, and sudden schedule accelerations. Exactly. The prime might experience a three month engineering delay, but the final completion date doesn't move. So suddenly they're demanding you work double shifts and weekends to recover their lost time. And if your contract doesn't clearly define how acceleration directives are compensated, you are funding their delay out of your own profit margin. That's a nightmare. What else should they look out for? Another major blind spot is owner furnished equipment. Often, the transit authority will procure the massive ticket items like the actual transit cars or specialized signaling hardware and provide them to the contractors to install. Which feels like
a win initially because you don't have to finance the purchase. Right, but the trap lies in the delivery schedule. What happens when your highly specialized installation crews are fully mobilized? Your overhead is burning at $20 ,000 a day, and the owner -furnished equipment gets delayed at a port for three months. Oh, wow. Who carries the cost of that downtime? Exactly. You have to explicitly negotiate standby time and demobilization clauses into your contract before you sign. Right. But that actually brings us back to the hook we started with, the ultimate nightmare. Interface risk. Oh, interface risk destroys companies. It is a contractual and physical boundary where your scope of work ends and the next subcontractor's scope begins. Let's return to the elevated guideway example. Okay, so you are the heavy civil sub
pouring the concrete structures. Another highly specialized sub is coming behind you to install the trackwork and signaling. Right. And if your concrete tolerance is off by a fraction of an inch, the trackwork subcontractor cannot lay their rails to the required specification. And the transit cars won't interface correctly. Exactly. The track sub will immediately file a claim stating they cannot proceed due to out -of -tolerance predecessor work. The entire critical path stops. And Kiewit looks at you to fund the multi -million dollar tear -out and rework. Yep. Managing interface risk requires your project managers to proactively coordinate with the adjacent trades before a single yard of concrete is ever poured. You have to clearly define, document, and sign off on
the exact handover conditions. The risks are massive, but obviously the rewards of securing a multi -year infrastructure backlog are generationally transformative for a construction business. Absolutely. Because of the sheer scale and the fierce competition, execution cannot wait until next quarter. The timeline is incredibly aggressive. Once the prime contract is awarded, the first sub -procurement packages typically hit the street in just 60 to 120 days. And 60 days in construction is barely enough time to hold a kickoff meeting. Right. You have to operate with a rapid -fire 90 -day playbook to position yourself ahead of the procurement wave. Let's lay out that playbook then. I imagine step one is just getting inside their digital ecosystem before the algorithms lock you out. You nailed it. Registering with a Kiewit supplier
quality portal inside the first 30 days is mandatory. Procurement teams on these mega projects, they do not blast emails to the public directory. They distribute task orders exclusively through their vetted portal. Exactly. If you're not registered and approved, you are invisible. So once you're in the portal, you need to actually pitch your value. I see so many contractors submit these glossy capability statements that look like, I don't know, truck commercials filled with drone shots and generic marketing copy. What does a mega project procurement officer actually need to see? They need to see a risk mitigation document, not a marketing brochure. That makes sense. Yeah. Your capability statement must explicitly detail your safety TRIR, your current audited bonding capacity limits, your exact specialized trade
experience, and your specific local certifications. Make it frictionless for their procurement officer to drop you into the approved -to -bid pile. And while digital presence is required, FaceTime still moves the needle, even on a $7 billion program. So step three is getting your boots on the ground at the Texas DOT Transit Industry Days. But don't just show up to collect business cards. You need to target the Kiewit Joint Venture Procurement Officers. Your goal is to uncover exactly how they are breaking apart the massive subcontracts. Are they packaging the underground utilities with the flat work? Are they splitting the stations by region? Exactly. You need to know how the pie is being sliced so you can tailor your estimating team's focus. And step four circles back to the financial fortress. Book a meeting
with your surety this week. Yes, do not wait for a bid package to drop to discover you are $10 million short on bonding capacity. Right, you got to map out the audit schedule and the work in progress cleanup required to achieve that two to three times multiplier we talked about. Step five requires locking your estimating team in a room to update the Davis -Bacon labor cost models. Map the exact prevailing wage rates across every single county this rail line intersects. Build the volatility into your baseline estimates today. That way, when the 60 -day bid window opens, you are actually pricing the work, not researching wage indices. And finally, step six, initiate the dialogue with your heavy equipment manufacturers right now. If your scope requires machinery with an 18 -month lead time, you need
to know your exact place in the global supply chain line before you commit to a Prime's aggressive execution schedule. The underlying theme of this entire playbook is preparation outmaneuvering scale. The Texas light rail program is a monumental shift in regional infrastructure. Definitely. Winning a piece of this doesn't require being the biggest contractor in the state. It requires understanding the bureaucracy, engineering the risk out of your bids, and executing your strategy before the competition even realizes the packages have dropped. And you know, while you are mapping out your strategy for phase one, you really need to look at where the industry is heading next. We spent a lot of time talking about labor volatility and equipment lead times today. We did. And the next wave of these transit megaprojects over the coming decade will rely heavily on autonomous
heavy machinery and AI -driven predictive scheduling. to mitigate those exact risks. Wow, yeah. The primes are already piloting this technology. Exactly. If you don't use the revenue and experience from phase one to fundamentally upgrade your own technological capabilities, you won't even meet the baseline prequalification standards to bid on phase two. You won't be competing against contractors with cheaper labor. You'll be competing against contractors who have engineered the labor risk entirely out of the equation. That is the ultimate strategic separator right there. I mean, are you building a business designed to survive the current market dynamics or are you actively engineering an organization equipped to dominate the highly automated multi -billion dollar infrastructure decade ahead Great point to end on. If you know
a contractor who is dealing with trying to break into heavy civil work or looking to secure a multi -year backlog in Texas, send them this deep dive. It could be the roadmap that lands them their next big contract. Absolutely. you on the next deep dive.