What is a change directive in construction?

A change directive, often called a construction change directive (CCD), is a written order from the owner to proceed with changed work before the price or schedule adjustment has been agreed.

Two construction professionals review paper plans beside a tablet at a jobsite workbench.
Plan reviews connect field conditions, drawings, and the next decisions on a job. AI-generated illustration.

A change directive keeps a job moving when the owner and contractor cannot agree on what a change is worth. Instead of stopping work while the number gets argued, the owner (usually through the architect) directs the contractor to do the work now and settle the price later. On AIA projects the form is G714-2017, Construction Change Directive. Design-build and CM adviser projects have their own versions (G745 and G733).

Think of it as a change order with the price left blank. The scope is defined and the contractor must proceed. The adjustment to the contract sum and contract time is worked out afterward, often on a cost-plus basis using actual records.

How a change directive works on a real job

Say a GC is building out a $2.4 million restaurant. During demo, the crew finds the existing grease line is undersized and has to be replaced to the street. The plumbing sub prices it at $38,000. The owner thinks it should be $24,000. Opening day is fixed, so the owner issues a CCD ordering the work and stating the adjustment will be based on actual cost plus the contract's markup.

  • The GC signs to acknowledge receipt, or signs to show agreement with the method of adjustment, or does not sign and reserves rights. Each choice has different effects under the contract.
  • The plumbing sub tracks labor hours, material invoices, and equipment daily, on separate cost codes.
  • Daily tickets are signed by the owner's rep or superintendent each day.
  • When the work is done, the actual cost comes in at $31,500 plus markup. The parties convert the CCD into a signed change order for that amount.

Why it matters for cash flow

Until the CCD becomes a change order, most contracts let the contractor bill only the amount the architect agrees is not in dispute. On a long job, that can leave tens of thousands of dollars of finished work unbilled. Track CCDs separately from approved changes on the WIP report so nobody counts them as guaranteed revenue.

Common mistakes with change directives

  1. Not keeping time and material records from day one. Without them, the price becomes whatever the owner says it is.
  2. Mixing CCD hours with base contract hours on the same cost code.
  3. Ignoring the schedule. A CCD can also adjust contract time, and the delay request should go in with the cost.
  4. Letting CCDs sit open for months. The longer they sit, the harder the records are to defend.
  5. Treating a verbal instruction as a CCD. A directive has to be written and signed by the owner's authorized person, otherwise it may be a field order or nothing at all.

Related terms

See change order request, written directive, time and materials, and claim. The guide on how to price a change order covers the markup side. Smart Business Automator tracks pending directives apart from approved change orders so billing and job cost stay honest.

Frequently asked questions

Is a construction change directive the same as a change order?

No. A change order is signed by owner, contractor, and usually architect, and agrees on price and time. A change directive orders the work before that agreement.

Does the contractor have to follow a change directive?

Under most standard contracts, yes, as long as it is within the general scope of the contract. Refusing can be a breach. Disagreement goes into the pricing, not into stopping work.

How is a CCD priced?

The directive states a method, such as lump sum, unit prices, or cost plus a fee. If no method is agreed, standard forms typically fall back to actual cost plus a reasonable allowance for overhead and profit.

Can I bill for CCD work before it is priced?

Usually only the amount the architect determines is not in dispute. Check the payment provisions of your contract.

Sources

  1. AIA Contract Documents: G-Series contract administration and project management forms
Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment