Billing

Lien waiver tracking template

A lien waiver tracking log matches every payment you make or receive to the right waiver from every sub and supplier, so nothing gets paid without paper behind it. Download it as a CSV for Excel or Google Sheets, or print it with each pay app.

An office manager and contractor review invoices with a calculator and laptop in a construction office.
Review invoices, committed costs, and cash timing together before making project decisions. AI-generated illustration.

A lien waiver tracking template is a log, not a waiver. Each row ties one payment to one party and records which lien waiver came back, for what amount, through what date, and whether the unconditional follow-up has arrived. The waivers themselves should be on the form your state requires, where it requires one. This page does not reproduce any statutory waiver language; it gives you the sheet that keeps track of them.

Owners and lenders often will not release the next draw until every waiver from the last one is in. One missing supplier waiver can hold up the whole pay app, so the log is really a cash flow tool.

How waiver rules differ by state

Some states set out statutory waiver forms; others leave the wording to the parties. Florida is a useful example of a state with statutory forms. Section 713.20 of the Florida Statutes gives a form for a waiver and release upon progress payment and one for final payment. It says a right to claim a lien may not be waived in advance, and its progress form states that it does not cover retention or work furnished after the date given. The same section says a person may not require a lienor to furnish a waiver different from those forms, and lets a lienor condition a waiver on a check actually being paid.

Other states have their own forms, deadlines, and notarization rules, and public jobs are often handled under bond claims rather than liens. Check the mechanics lien guide for your state, such as Florida, before you accept or sign any waiver form.

How to fill in each column

  • Payment: the pay app or draw number the payment belongs to.
  • Party and tier: the sub or supplier, and where they sit: direct sub, supplier to a sub, or lower-tier subcontractor.
  • Payment amount and through date: what this party is being paid and the date the work runs through. The waiver must match both.
  • Waiver type: conditional or unconditional, progress or final.
  • Received date: when the signed waiver arrived.
  • Matches payment: yes, or what is wrong: amount, date, job name, or form.
  • Unconditional received: the date the unconditional waiver came in after the money cleared.
  • Status: complete, waiting, return for correction, or hold payment.

Common mistakes

  1. Accepting a waiver for an amount or through date that does not match the payment.
  2. Collecting from direct subs only and missing suppliers to those subs, who may also have lien rights.
  3. Signing an unconditional waiver before the check has cleared.
  4. Using a generic internet form in a state that requires its own.
  5. Forgetting the final waivers, including retainage, at closeout.

Related forms and guides

Set up the routine with how to manage lien waivers on every payment and learn the difference in conditional vs unconditional lien waivers. Payments come off the schedule of values template, held money is tracked on the retainage tracking template, and the subcontractor COI tracking template covers the other check you should run before paying a sub.

Smart Business Automator tracks waivers against each payment and flags subs and suppliers still missing paperwork before a draw goes out. See construction accounts receivable automation.

Lien waiver tracking log

Download CSV
PaymentPartyTierPayment amountThrough dateWaiver typeReceived dateMatches paymentUnconditional receivedStatus
Pay app 2Ridgeline Drywall LLCDirect sub20,700.002026-04-30Unconditional progress2026-05-27Yes2026-05-27Complete
Pay app 3Ridgeline Drywall LLCDirect sub24,840.002026-05-31Conditional progress2026-06-08Yes2026-06-24Complete
Pay app 3Gulf Building SupplySupplier to Ridgeline6,210.002026-05-31Conditional progress2026-06-09YesWaiting on unconditional
Pay app 3Brightwire Electric Inc.Direct sub19,980.002026-05-31Conditional progress2026-06-10No, waiver shows 21,600.00Return for correction
Pay app 3Coastal Mechanical Co.Direct sub11,070.002026-05-31Not receivedHold payment
  • Sample data only. Replace the example parties and amounts with your own job.
  • This is a tracking log. Use the waiver form required by the state where the project is located, if it has one.
  • Every waiver should match the payment amount, through date, and project name exactly.
  • Track suppliers and lower-tier subs as separate rows, not under the direct sub.
  • Add final waivers, including retainage, as their own rows at closeout.

Frequently asked questions

What is lien waiver tracking?

It is the process of matching each payment on a project to the signed waiver from each party being paid, and following up until the conditional and unconditional waivers are all in.

Do I need a waiver from suppliers as well as subs?

Often yes, because suppliers to subcontractors may have lien rights depending on the state. Track them as separate rows.

Can I use any lien waiver form?

Not everywhere. Some states, such as Florida, set out statutory forms, and Florida says a lienor cannot be required to furnish a different form. Check your state's rules before using a generic waiver.

Can I use this lien waiver tracking template in Excel?

Yes. Download the CSV and open it in Excel or Google Sheets. Filter by status before each pay app to see what is missing.

Sources

  1. Florida Legislature: Florida Statutes section 713.20, Waiver or release of liens
Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment