What is arbitration in construction?

Arbitration is a private way to resolve a contract dispute: the parties present their case to one or more neutral arbitrators, whose decision (the award) is usually binding and very hard to appeal.

Two construction professionals review paper plans beside a tablet at a jobsite workbench.
Plan reviews connect field conditions, drawings, and the next decisions on a job. AI-generated illustration.

Arbitration is a form of dispute resolution in which the parties agree to let a private neutral, or a panel of three, decide their dispute instead of a judge or jury. In construction it usually comes from a clause in the prime contract or subcontract that says claims will be decided by arbitration, often under the rules of a named organization. The arbitrator hears evidence, then issues an award that can be enforced in court.

Contractors tend to have strong opinions about it. Supporters like that arbitrators can be people who understand schedules, change orders, and differing site conditions. Critics point to fees and the near impossibility of appeal.

How arbitration works on a construction dispute

  1. The clause. The contract says disputes go to arbitration, names the rules, the location, and sometimes how many arbitrators. Many contracts require mediation first.
  2. The demand. The claimant files a demand describing the claim and the amount.
  3. Choosing the arbitrator. The parties pick from a list or agree on a name. Construction panels often include attorneys, engineers, and former contractors.
  4. Exchange of documents. Discovery is usually narrower than in court, but in a big delay case it can still mean thousands of pages of daily logs, schedules, and emails.
  5. The hearing. Witnesses testify, experts present, and the arbitrator asks questions. It looks like a trial without a jury.
  6. The award. The arbitrator decides. A party can ask a court to confirm the award so it can be enforced like a judgment.

What federal law says

The Federal Arbitration Act makes a written arbitration provision in a contract involving interstate commerce valid, irrevocable, and enforceable, except on grounds that would allow any contract to be revoked (9 U.S.C. 2). Most construction contracts involve materials and money crossing state lines, so the Act usually applies alongside state arbitration statutes.

Getting an award thrown out is hard. Under 9 U.S.C. 10, a federal court may vacate an award only for narrow reasons: it was obtained by corruption, fraud, or undue means; there was evident partiality or corruption in the arbitrators; the arbitrators were guilty of misconduct such as refusing to hear pertinent evidence; or the arbitrators exceeded their powers. Being wrong on the facts or the contract is generally not on that list.

Example: a subcontractor delay claim

Say a mechanical sub claims $340,000 for extended field overhead after a GC resequenced the job. The subcontract has an arbitration clause and a flow-down clause tying the sub to the prime contract's dispute process. The owner contract has its own arbitration clause. If the delay was caused by the owner, the GC wants the sub's claim heard together with its own claim against the owner, so one arbitrator sees the whole story. Whether that consolidation is allowed depends on the wording of both contracts, which is why the clause matters long before anyone is angry.

Common mistakes

  • Signing a subcontract without reading where the hearing will be held. A clause requiring arbitration in the GC's home state can make a small claim not worth pursuing.
  • Missing contract notice deadlines. Arbitration does not fix a late notice of claim.
  • Assuming arbitration is cheap. Arbitrator fees are paid by the parties, often by the hour, on top of lawyers and experts.
  • Weak records. The side with dated daily logs, photos, and signed change orders usually wins.
  • Forgetting lien and bond deadlines. Filing a mechanics lien or bond claim may still be needed to protect rights even when the contract requires arbitration.

Related terms

See claim, delay claim, flow-down clause, and the award entry for the separate meaning of award in bidding. For prevention, read change order disputes and how to avoid them. Smart Business Automator keeps daily logs, RFIs, and change orders tied to each job, which is the record an arbitrator will ask for. See construction workflow automation.

Frequently asked questions

Is arbitration binding?

Usually. Most construction arbitration clauses call for binding arbitration, and courts can vacate an award only on narrow grounds such as fraud, evident partiality, misconduct, or arbitrators exceeding their powers (9 U.S.C. 10).

Is arbitration faster than going to court?

Often, but not always. A large delay claim with many experts can still take a long time. The speed comes mostly from scheduling flexibility and narrower discovery.

Can I refuse to arbitrate if I signed a contract with an arbitration clause?

Generally no. The Federal Arbitration Act makes written arbitration provisions in contracts involving commerce enforceable, except on grounds that would void any contract. Talk to a construction attorney about your specific clause.

What is the difference between mediation and arbitration?

A mediator helps the parties reach their own settlement and decides nothing. An arbitrator hears the case and issues a decision.

Sources

  1. Cornell LII: 9 U.S.C. 2, Validity, irrevocability, and enforcement of agreements to arbitrate