What is a cash flow projection in construction?

A cash flow projection is a week-by-week or month-by-month forecast of the cash a contractor expects to receive and spend, so the company can see a shortfall before it hits the bank account.

An office manager and contractor review invoices with a calculator and laptop in a construction office.
Review invoices, committed costs, and cash timing together before making project decisions. AI-generated illustration.

A cash flow projection (also called a cash flow forecast) estimates the timing of money moving in and out of a construction company. Profit tells you whether a job makes money. The projection tells you whether you can make payroll on the 15th while waiting on a pay app that was approved but not yet paid. For a contractor, those are two very different questions.

Most projections run 13 weeks forward for the company and the full duration for each active job. They start from the schedule of values and the construction schedule, then shift every dollar to the date it actually clears, not the date it is billed or incurred.

How a cash flow projection works on a real job

Say a framing contractor lands a $480,000 subcontract on a four-month apartment job. The GC pays 45 days after the pay app is submitted and holds 10 percent retainage. Payroll goes out every week. Lumber is bought on 30-day terms. The projection lays those out side by side.

Example: first three months of a $480,000 framing subcontract
MonthBilledCash receivedCash paid outNet for month
Month 1$90,000$0$84,000-$84,000
Month 2$150,000$0$128,000-$128,000
Month 3$150,000$81,000$131,000-$50,000

The job is profitable on paper. It is also $262,000 in the hole by the end of month three, because the first check ($90,000 less 10 percent retainage) lands 45 days after the month 1 billing goes in. Without a projection, the owner finds that out from the bank. With one, the owner knows in week one that a line of credit draw or a mobilization payment has to be negotiated before the crew starts.

What goes into the projection

  • Cash in: expected pay app approvals, the client's real payment lag (not the contract terms), retainage release dates, and deposits.
  • Cash out: weekly payroll and labor burden, supplier terms, subcontractor payments, equipment, insurance premiums, and overhead.
  • Timing rules: pay-when-paid terms to your own subs, lender draw cycles, and any construction draw inspection delays.
  • Committed spend: open purchase orders and subcontracts that will turn into bills, tracked as committed cost.

Common cash flow projection mistakes

  1. Using contract payment terms instead of what the client actually does. If a GC says net 30 and pays in 52 days, use 52.
  2. Forgetting retainage. Ten percent held on a long job is cash you will not see for months.
  3. Building it once at bid time and never updating it. A projection is only useful if it is refreshed weekly against real receipts.
  4. Leaving out change orders that are approved but not yet billable, or counting unapproved ones as cash.
  5. Rolling every job into one number. A single bad job can hide inside a healthy total.

Related terms

A projection sits next to the WIP report, cost to complete, and working capital. For a full walkthrough, see how to forecast cash flow for a construction business or start from the construction cash flow template. Smart Business Automator pulls billed, received, and committed amounts from each job into one view, which is the raw data a projection needs.

Frequently asked questions

How far out should a construction cash flow projection go?

Thirteen weeks is a common horizon for the company, with each active job projected to its finish date. Short horizons catch payroll problems; job-length projections catch retainage and closeout gaps.

Is a cash flow projection the same as a budget?

No. A budget says what a job should cost. A projection says when cash will move. A job can be on budget and still run out of cash because payments lag spending.

How often should it be updated?

Weekly is the practical standard for most contractors, right after payroll and receipts are posted. Monthly updates miss short-term crunches.

What causes most construction cash flow shortfalls?

Slow client payments, retainage, front-loaded material buys, and unbilled change work are the usual causes. A projection makes each one visible before it hurts.