What is work in progress in construction?

Work in progress (WIP) means the contracts a contractor has started but not finished, and in accounting it refers to the earned revenue, costs, and billings on those open jobs, measured to show whether each job is overbilled or underbilled.

An office manager and contractor review invoices with a calculator and laptop in a construction office.
Review invoices, committed costs, and cash timing together before making project decisions. AI-generated illustration.

In plain terms, work in progress is everything you have going. In construction accounting, it is more specific: for each open contract, how much of the job is done, how much revenue that work has earned, what it has cost, and how much you have billed. Comparing billed to earned shows whether you are ahead on billing (overbilling) or behind (underbilling). The schedule that lays this out job by job is the WIP report.

WIP matters because a contractor's bank balance can look great while the jobs underneath are losing money, or look tight while jobs are healthy. WIP closes that gap.

How WIP is measured on a real job

Most contractors using the percentage of completion method measure progress by cost: costs to date divided by total estimated cost. Say a commercial roofer has a $750,000 contract with an estimated cost of $600,000. At month end, costs to date are $240,000 and billings to date are $330,000.

Example: WIP calculation for one job (illustrative)
LineAmount
Contract value$750,000
Estimated total cost$600,000
Cost to date$240,000
Percent complete (240,000 / 600,000)40%
Earned revenue (40% x 750,000)$300,000
Billed to date$330,000
Overbilled (billings in excess of earnings)$30,000

The $30,000 overbilling is a liability. The roofer has been paid for work it has not done yet, which is fine as long as it knows it and does not spend it as profit. If the estimated cost turns out to be $680,000, every number changes, which is why the cost to complete forecast is the most important input in WIP.

Run the same math on every open job and total it. A company can have three jobs overbilled and two badly underbilled, and the net figure hides both stories. Look at each job line before looking at the bottom.

Why WIP matters

  • Profit timing: WIP shows profit as it is earned rather than when cash arrives or the job closes.
  • Early warning: jobs where the estimated cost keeps rising show margin fade months before closeout.
  • Bonding and banking: sureties and lenders review WIP schedules to judge whether a contractor can take on more work.
  • Cash planning: big overbillings mean cash in hand that is already owed in work; big underbillings mean cash you have spent but not collected.

Common mistakes

  1. Stale estimates. Percent complete is only as good as the estimated total cost. If PMs do not update it monthly, WIP is fiction.
  2. Unapproved change orders counted as revenue. Including pending changes in contract value without care inflates earned revenue.
  3. Mismatched cutoffs. Costs through the 31st with billings through the 25th produce false over or under billings.
  4. Ignoring committed costs. Material ordered but not invoiced can make a job look further along on billing than cost.
  5. Treating overbilling as profit. It is a liability until the work is done.

Related terms

See revenue recognition, completed contract method, estimate at completion, and backlog. Smart Business Automator builds job-level WIP views from your job costs and billing, so over and under billings are visible every month.

Frequently asked questions

What is work in progress in construction accounting?

Construction WIP tracks unfinished contracts by comparing costs, estimated completion costs, earned revenue and billings. It helps explain job profitability and billing differences at a consistent reporting date.

What is the standard format for a construction progress report?

A field progress report typically records completed work, upcoming activities, issues and schedule status. An accounting WIP schedule instead organizes contract value, costs, revenue and billings by job. They serve different decisions.

Is WIP a liability or asset?

A WIP schedule can show both. Earned revenue exceeding billings can create a contract asset; billings exceeding earned revenue can create a contract liability. Classification depends on the contract and accounting treatment.

How to build a WIP report?

Use one cutoff date, reconcile job costs and billings, update each job’s remaining-cost estimate, calculate completion and earned revenue, then investigate billing differences with the project manager before closing the period.

What does a WIP report look like?

It is usually a table with one row per contract. Columns show revised contract value, costs to date, estimated total costs, completion percentage, earned revenue, billings and the overbilling or underbilling balance.

How do I calculate WIP in construction?

For a cost-to-cost example, divide eligible costs incurred by estimated total costs, then multiply by the applicable contract revenue. Compare earned revenue with billings. Confirm that cost-to-cost measures performance appropriately for that contract.

Can you give me an example of work in progress?

Illustration: a $500,000 contract has $160,000 of eligible costs against a $400,000 total estimate. At 40% complete, earned revenue is $200,000. Billings of $180,000 leave a $20,000 underbilling difference.

What is the formula to calculate WIP?

The basic cost-to-cost calculation is completion = eligible costs to date ÷ estimated total costs. Earned revenue = completion × applicable contract revenue. Earned revenue minus billings identifies the billing difference; it is not cash collected.

Sources

  1. CFMA: How to actually read a WIP schedule
  2. CMAA: Tracking cash flow and profits throughout the project life cycle
Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment